Skip to the content

Lakes on Legacy Project Highlight

Let’s take a look at our recently completed project at the Lakes on Legacy!

The community reached out to us because they had just put in a large pump in the lake to transfer water back to their higher lake and through their water feature. They asked us what could be done to prevent debris and silt from getting to their expensive new pump. To solve their issue, we constructed a gabion wall around a collection area to block trash and silt from reaching the sump tank. We then installed two 8” perforated draw tubes through the wall and into deep points in the lake to avoid algae buildup blocking the holes.

Click the contact link here to get started on the design/build solution of your project.

 

     

Need a solution for your water issues?

Let us solve it for you.